Archives Search


Search only: Library, Archives Advanced Search, Ancestors, Images, Search All

To submit a comment, contact webservices@lac-bac.gc.ca

Search Help

Description found in Archives

Construction of the Miramichi Bridges on the Intercolonial Railway - Southwest Branch. Pier F - Completed/Construction des ponts de Miramichi, sur le chemin de fer Intercolonial. Embranchement sud-ouest. Pilier F terminé. 

Date(s)

1873-1874

Place of creation

No place, unknown, or undetermined

1 photograph ; 140x185 mm
Positive Paper Silver - albumen
Graphic (photo)
90: Open
Nil
Graphic (photo)
Copy negative PA-022578
90: Open
Item no. (creator)
13
Graphic (photo)
90: Open
Box
S9039
90: Open
Other accession no.
1936-272 NPC

Terms of use

Credit: Library and Archives Canada/PA-022578
Restrictions on use: Nil
Copyright: Expired.

Finding aid no.

Additional name(s)

Photographer: Unknown.

Additional information

In previous entries, the locations given was T2735. However, this does not correspond with the information found in accession file.

Described by the RECON project.

Series title
PF18

Subject heading

1. Miramichi River (N.B.)
2. N.B. - NEWCASTLE - BRIDGES.
3. TRANSPORTATION - LAND - BRIDGES.
4. Miramichi, Rivière (N.-B.)

Private

Other system control no.

3264139